Eugenio V.
Santos
Eugenio.santos@zevatechnology.com
Qualifications
Highly motivate with excellent communication skills. Works well even under
pressure. Fully experience in installation and trouble shooting, handling
Commissioning and Integration of Nokia Equipment Multi-radio 2G, 3G, 4G &
LTE by using E1/T1, Microwave, Fiber transmission and CSR7705 provisioning. Work
Experience: May,2015-
Jan.22,2016 Field Manager Zeva
Technology Nokia Ext. Greenfield
T-Mobile Project Denver Market
USA v
Supervision for the standards and quality of the
contractors installation from Civil, Tower and BTS installation. v
Responsible to report of all the details update
every end of the day works for every sites under my area of responsibility. v
Responsible to request from the higher management
of all changes in the plan for all installation issue. v
Works for the site readiness before the
integration. Set up the transmission, prepare the system module by loading
the software and provisioning of the SCR7705. v
Commission and Integrate the site and conducting
trouble shooting if needed. Sept.29,2014-
May,2015 CST/BTS
Engineer Zeva
Technology Nokia Ext. Rural America
T-Mobile Project Minneapolis
Market Minnesota USA v
Responsible for commissioning and integration of
2G, 3G, 4G & LTE BTS Nokia equipment in a different configuration. v
Responsible for all kinds of BTS trouble shooting
including Antenna/ MHA and RET issues, also involve to correct the network
quality issues likes drop call, swap sector and other BTS performance issues.
Oct.,2013-
Sept.22,2014 Team Leader
Installation Glotel Inc. T-Mobile Sector-Split
Project Miami Florida
USA v
Leading the team for all ground works and tower
installation. v
Responsible for all kind of testing before and
after the installation PIM test, antenna RET re-naming, sweep test, fiber
test and azimuth verification. v
Responsible for all rectification after the
integration. Sept.,2012-
May,2013 Huawei Swap
Project Telecom
Network Solutions Transmission
Audit, Installation supervisor.
v
Responsible in handling different teams for
transmission audit, IP provisioning and transmission microwave installation. v
Can perform survey & audit of old
transmission equipment and supervision of all transmission installation &
E1 migration. v
Can also perform BTS installation and
supervision.. May,2009 –
May,2012 TI/FLM
Engineer
Nokia Siemens
Networks (FCGI) Zain Jeddah
K.S.A. v Under FLM
works v Perform all
kinds of trouble shooting including quality and optimization alarms 2G &
3G nokia equipment, flexi hopper, hybrid transmission and responsible for
keeping a good quality of networks all around Jeddah and some site in Jeddah
Madinah & Jeddah Makkah road for over 275 sites.. v Responsible
for all preliminary acceptance and handover for all new sites, checking the
quality of all installation from civil to NI works including bts , rectifier,
tower & antenna installation, antenna sweep test , power & external
alarm testing also responsible to coordinate the performance and drive test
team to check the quality performance of the site. v Under TI works v Leading the
team for more than 70 sites installation of bts, microwave disc, GSM antenna
including cross connection, link alignment, transmission connectivity from
end to end, commissioning and site integration. v Responsible
for all the sites awarded to the company for quality checking and
rectification of all installation issue and software/ hardware upgrades. Sept.,2008
–Feb.,2009 Second Line
Support
Engineer
Nokia Siemens
Networks-Jeddah K.S.A. v To support FLM
for any kind of BTS and transmission alarms. v Perform all
kinds of trouble shooting including optimization and quality alarms of 2G
& 3G Nokia equipment. v Responsible
for keeping a good quality of networks in the whole area of Jeddah, Taif,
Riyadh-Makkah road and Jeddah-Madina road Oct.,2007 –
June,2008 TI Engineer
Team
Leader
Penta
Consulting
Ltd.
Assignment:
Qtel Swap-out project, QATAR v
Perform over 120 elements or cabinets of Flexi
BTS to installed. Handled different configuration from 2+0+0 up to 4+0+0
for MC type, Cost optimize configuration and normal configuration from 2+2+0
up to 8+8+8 for Macro type BTS. v
Responsible to check all installation for good
quality standard performance of the team. v
Responsible for preparing of transmission plan
and DC powers tapping before the swap. v
Responsible for Commissioning and Integration of
Flexi edge BTS which is scheduled for swap. v
Perform test calls, handover calls testing and
other BTS testing. v
Responsible for BTS trouble shooting after the
integration. v
Conduct Quality check for other team installation
as part of team leaders routine. v
Prepare site integration checklist reports and
site folders. Oct.2006-
Sept.2007 Commissioning
Engineer (AHD
Advance)
Smart and
Globe Telecom Project, Philippines v
Supervision, Commissioning and Integration of 3G
Nokia and 3G Siemen roll-out Visayas area in Philippines Ericsson equipment
RBS3206 and RBS3106 for Globe Telecom. v
Transmission Circuit Provisioning for 3G site
integration and E1 upgrades. v
Responsible for site preliminary acceptance and
site rectification. Mar.2006-July2006 Nokia TI
Supervisor
DMN
Installation Pty
Ltd.
Assignment:
Nokia Telenor Project, Pakistan v
Responsible for the site preparation survey (area
status, site availability, proposal for the BTS location, tower preparation
importance). v
Checks out list for materials and equipment
needed. v
Supervised from Civil to TI implementation and
responsible for preparing E1 circuit provisioning from BSC to far end for the
new sites. v
Handling commissioning and integration and
perform test call after integration. April2005-
Aug.2005 TI Engineer
DMN
Installation Pty
Ltd
Assignment: Nokia Telenor Project, Pakistan v
Perform installation works for G900 and G1800
Ultra site BTS including AC/DC Power supply cabinet, Rectifiers, Batteries,
MW antennas, panel antennas and feeder cables. v
Conduct VSWR Testing after every feeder cable
installations. v Perform flexi
hopper commissioning and MW antenna panning for transmission links
integration. v Responsible
for commissioning and integration of G900 and G1800 UltraBTS. v Prepare site
folders documentations for site acceptance purposes. v Responsible
for troubleshooting of detected alarms on UltraBTS. Create and simulation of
external alarms. v Participated
on having On-Air of almost 190 sites in cities of Islamabad and Lahore in a
period of less than 3months which enables TELENOR, Nokia Equipment Operator,
to launch in Pakistan. May 1995-April2005 O&M Engineer
GlobeTelecom, Philippines
v Responsible
for all kind of bts and power related trouble shooting, MW antenna
Installation, alignment for transmission link, commissioning and integration
of Nokia equipments including of all flexi units (BTS & Transmission
Units). Special Skills &
Qualifications:
Leadership, planning, people –handling skills
Well-rounded person Seminars and Trainings Attended: v TMO MRGREENFIELD-BTS-001-FLXLTE-USA
06/08/2015 Irving Texas USA v TMO MRGREENFIELD-BTS-003-FLXLTE-USA Nokia Install & Commissioning& Integration
for TMO Greenfield TMO Greenfield Level 1&3 06/10/2015 Irving Texas USA v
4G-LTE700-MULTIRADIO-001-FLXTMO_INST_A-USA Nokia Flexi LTE Multi Radio BTS Installation
Training T-MOBILE 700/1900 Mhz Expansion *Delta Training 09/29/2014 Irving Texas USA v
4G-LTE700-MULTIRADIO-003-FLXTMO_C&I_B-USA NSN Flexi LTE Multi Radio BTS Commissioning &
Integration For T-Mobile 700/1900 Mhz Expansion *Delta
Training 10/01/2014 Irving Texas USA v
AUTHORIZED CLIMBER/RESCUER COMTRAIN Tower Climbing Safety & Rescue
Training 10/29/2013 Pensacola Florida USA v AC/DC Power system v First aid Training v Basic Life Support Training v Fundamentals of Telecommunications Training v
Preventive Maintenance and Operation of
Caterpillar Electric Sets v Alcatel GSM 900/DCS 1800 Base Station Subsystem Introduction v Tower Scaling Course v Training Course for Operation and Maintenance on Digital Microwave Radio Links
(Equipment Alcatel 9400 UX and LX) v Industrial Climbing v ELTEK Rectifier Power Systems Seminar v Nokia Ultra/ Flexi Edge Operation and Troubleshooting Course v BTS Commissioning Course Educational Backgrounds:
Tertiary: Guzman Institute of Technology (1986-1988)
Course: Electrical Technology Quiapo
Manila,Philippines
Secondary:Esteban Abada High School (1982-1986) Blumentritt
St. Sampaloc Manila, Philippines
Primary:Ramon Magsaysay Elementary School (1976-1982)
Apo St. La Loma, Quezon City Philippines Reference: Engr. Alvin Vicente
Nokia Field Manager
T-Mobile Rural Americas Project
Central Region- Chicago USA
+1 770 366 8951
Engr. Tom Dietrich
Project Manager
T-Mobile Rural America Project
Minneapolis, Minnesota USA
+1 612 839 2055
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|